水立方基本介紹英語怎麼說
1. 關於北京奧運會鳥巢和水立方的英語簡介
"Water Cube" in Beijing Olympic Park, which with the wall separating the "Bird's Nest" and known as the Beijing Olympic Games along with the two landmark buildings. December 24, 2003, the National Swimming Center (Water Cube) and the National Stadium (Bird's Nest) at the same time under construction. National Swimming Center, general manager of Conway said that the blue color of the water molecules in the east building and the "Bird's Nest", a round one, reflecting China's "hemispherical dome" building concept. With the main stadium "Bird's Nest" design than the "Water Cube" reflects the more women like soft, one masculine, one feminine, in sharp contrast to the highly visual impact.
「水立方」位於北京奧林匹克公園內,它與一牆之隔的「鳥巢」一起被並稱為北京奧運會兩大標志性建築物。2003年12月24日,國家游泳中心(水立方)與國家體育場(鳥巢)同時開工建設。國家游泳中心公司總經理康偉說,這個湛藍色的水分子建築與東面的「鳥巢」,一圓一方,體現了中國「天圓地方」建築理念。與主場館「鳥巢」的設計相比,「水立方」體現了更多的女性般的柔美,一個陽剛,一個陰柔,形成鮮明對比,在視覺上極具沖擊力。
2. 鳥巢 水立方的英語介紹
Venue Name: National Stadium (Bird's Nest)
Building Venue: Olympic Park
Building area (million ㎡): 25.8, the number of seats: 80,000 permanent seats, 11,000 temporary seats
Function of the events: track and field, soccer
After the function: international and domestic sports competition and cultural, recreational activities
Starting Time: 2003.12.24
Building roof stadium saddle-shaped surface, long axis to 332.3 meters, 296.4 meters for the short axis, the highest height of 68.5 meters, the lowest height of 42.8 meters.
Symbolic significance: the Chinese traditional culture methods hollowing, ceramics lines, the brilliant red and warm, and modern most advanced steel structure design perfectly blending together
National Swimming Center, also known as the "Water Cube" (Water Cube), Olympic Park in Beijing, the Beijing 2008 Summer Olympic Games for the construction of the main swimming pool, but also the 2008 Beijing Olympics, one of landmark buildings. Its design, is a global design competition created "water cube" ([H2O] 3) program. December 2003 24 starts, is expected to be completed in October 2007 inspection. Its relationship with the National Stadium (commonly known as bird's nest) are shown in the northern end of Beijing City on both sides of the central axis, a relatively common form a complete historical and cultural city in the image of Beijing. National Swimming Center, the planning and construction of 62,950 square meters of land, with a total building area of 65000-80000 square meters, of which the underground sections of the building area of not less than 15,000 square meters, respectively dimensions 177m × 177m × 30m. Has been received from more than 90 countries and regions more than 330,000 Hong Kong, Macao and Taiwan Compatriots and Overseas Chinese contributions to more than 800 million yuan, of which Cheng Yu-tung, CHENG Kar-shun father and son and their businesses have donated 50 million yuan.
【Investment: about 1.02 billion
【Building area (㎡): 79,532 square meters
【Number of seats: permanent seats for the 4000, 2000 can be dismantled, and 11,000 temporary seats
【Purposes ring the Olympic Games: Swimming, diving, synchronized swimming, water polo
【Purposes ring the Paralympic Games: swimming, diving, synchronized swimming, water polo
【Owner units: Beijing State-owned Assets Operation Co., Ltd.
【Design units: Medium SEKKEI Commonwealth
【Total package units: one in the Council's Capital Construction Development Co., Ltd.
Purposes: in 2008 ring the Olympic Games, National Swimming Center for swimming, diving, synchronized swimming, water polo competition, etc., can accommodate seating 17,000 spectators, including permanent seating for 6000 spectators, the Olympic Games ring the temporary addition of 11,000 seats (after the removal of ). After the match will be built into the international advanced level, and set swimming, sports, fitness and leisure center in one.
譯文
場館名稱:國家體育場(鳥巢)
建設地點:奧林匹克公園
建築面積(萬㎡):25.8、座席數:永久座席80000個,臨時性座席11000個
賽時功能:田徑、足球
賽後功能:國際國內體育比賽和文化、娛樂活動
開工時間:2003.12.24
體育場建築頂面呈鞍形,長軸為332.3米,短軸為296.4米,最高點高度為68.5米,最低點高度為42.8米。
象徵意義:中國傳統文化中鏤空的手法、陶瓷的紋路、紅色的燦爛與熱烈,與現代最先進的鋼結構設計完美地相融在一起
國家游泳中心又被稱為「水立方」(Water Cube),位於北京奧林匹克公園內,是北京為2008年夏季奧運會修建的主游泳館,也是2008年北京奧運會標志性建築物之一。它的設計方案,是經全球設計競賽產生的「水的立方」([H2O]3)方案。2003年12月24開工,預計在2007年10月竣工驗收。其與國家體育場(俗稱鳥巢)分列於北京城市中軸線北端的兩側,共同形成相對完整的北京歷史文化名城形象。國家游泳中心規劃建設用地62950平方米,總建築面積65000-80000平方米,其中地下部分的建築面積不少於15000平方米,長寬高分別為 177m × 177m × 30m.目前已經收到來自90多個國家和地區的33萬多港澳台僑同胞的捐款8億多元人民幣,其中鄭裕彤、鄭家純父子及屬下企業曾捐贈五千萬元人民幣。
【投資】:約為10.2億
【建築面積(㎡)】:79532平方米
【座席數】:永久座席為4000個,2000個可拆除的,臨時性座席11000個
【奧運會期間的用途】:游泳、跳水、花樣游泳、水球
【殘奧會期間的用途】:游泳、跳水、花樣游泳、水球
【業主單位】:北京市國有資產經營有限責任公司
【設計單位】:中建設計聯合體
【總包單位】:中建一局建設發展有限公司
用途:2008年奧運會期間,國家游泳中心承擔游泳、跳水、花樣游泳、水球等比賽,可容納觀眾坐席17000座,其中永久觀眾坐席為6000座,奧運會期間增設臨時性座位11000個(賽後將拆除)。賽後將建成為具有國際先進水平的、集游泳、運動、健身、休閑於一體的中心。
3. 水立方用英語怎麼翻譯
國家體育場(鳥巢) Beijing National Stadium (Bird's Nest/Olympic Stadium)國家游泳中心(水專立方屬 ) National Aquatics Centre(Water Cube)
4. 水立方英語名稱
Water Cube
參考資料:http://www.beijing2008.cn/16/48/article214004816.shtml
5. 水立方的英文簡介
The Beijing National Aquatics Center ( 北京國家游泳中心), also officially known as the National Aquatics Center, and colloquially known as the Water Cube ( 水立方), is an aquatics center that was built alongside Beijing National Stadium in the Olympic Green for the swimming competitions of the 2008 Summer Olympics. Despite its nickname, the building is not an actual cube, but a cuboid (a rectangular box). Ground was broken on December 24, 2003, and the Center was completed and handed over for use on January 28, 2008. Swimmers at the Water Cube broke 25 world records ring the 2008 Olympics.
After the Olympics, the building underwent a 200 million Yuan revamp to turn half of its interior into a water park. The building officially re-opened on August 8, 2010.
In July 2003, the Water Cube design was chosen from 10 proposals in an international architectural competition for the aquatic center project.The Water Cube was specially designed and built by a consortium made up of PTW Architects (an Australian architecture firm), Arup international engineering group, CSCEC (China State Construction Engineering Corporation), and CCDI (China Construction Design International) of Shanghai.The Water Cube's design was initiated by a team effort: the Chinese partners felt a square was more symbolic to Chinese culture and its relationship to the Bird's Nest stadium, while the Sydney based partners came up with the idea of covering the 'cube' with bubbles, symbolising water. Contextually the cube symbolises earth whilst the circle (represented by the stadium) represents heaven. Hence symbolically the water cube references Chinese symbolic architecture.
Comprising a steel space frame, it is the largest ETFE clad structure in the world with over 100,000 m² of ETFE pillows that are only 0.2 mm (1/125 of an inch) in total thickness[9]. The ETFE cladding allows more light and heat penetration than traditional glass, resulting in a 30% decrease in energy costs.
The outer wall is based on the Weaire–Phelan structure, a structure devised from the natural formation of bubbles in soap lather. The complex Weaire–Phelan pattern was developed by slicing through bubbles in soap foam, resulting in more irregular, organic patterns than foam bubble structures proposed earlier by the scientist Kelvin.Using the Weaire–Phelan geometry, the Water Cube's exterior cladding is made of 4,000 ETFE bubbles, some as large as 9.14 metres (30.0 ft) across, with seven different sizes for the roof and 15 for the walls.
The structure had a capacity of 17,000[9] ring the games that is being reced to 7,000. It also has a total land surface of 65,000 square meters and will cover a total of 32,000 square metres (7.9 acres). Although called the Water Cube, the aquatic center is really a rectangular box (cuboid)- 178 metres (584 ft) square and 31 metres (102 ft) high.
北京國家游泳中心(北京國家游泳中心),也正式稱為國家游泳中心,俗稱水立方(水立方),是一個水上運動中心,建於與北京國家體育館在綠色奧運游泳比賽的2008年夏季奧運會的。盡管它的綽號,建築不是一個實際的數據集,但用手摸一摸長方體(一個矩形框)。地面被打破了2003年12月24日,中心已經完成,並將使用在2008年1月28日。游泳者在水立方打破了25個世界紀錄在2008年奧運會上。
奧運之後,經歷了一個2億元建設改造將一半的室內進入水公園。建築正式重啟2010年8月8日。
2003年7月,水立方的設計是選自10份提議在一個國際建築設計競賽對水產養殖中心項目。水立方是特別的設計、建造組成的財團PTW建築師事務所(一家澳大利亞建築公司),奧雅納公司國際工程集團,中建股份(中國建築工程總公司),好動(中國建築設計國際)的上海。這個水立方的設計一開始是由一個團隊的努力:中國合作夥伴感到一個廣場更多是象徵性與中國文化和它的關繫到鳥巢體育館,而悉尼建立合作夥伴想出這個點子的覆蓋的立方」有很多泡沫,象徵著水。上下文立方體象徵著地球而循環中(由體育場)代表了天堂。因此就象徵意義而言,水立方引用中國的標志性建築。
包括一個鋼網架,它是最大的ETFE膜結構的世界裡覆蓋超過100000 m²的膜枕頭,只有0.2毫米(1/125英寸)總厚度[9]。ETFE的熔覆允許更多的光和熱滲透比傳統的玻璃,導致能源成本下降了30%。
The outer wall is based on the Weaire–Phelan structure, a structure devised from the natural formation of bubbles in soap lather. The complex Weaire–Phelan pattern was developed by slicing through bubbles in soap foam, resulting in more irregular, organic patterns than foam bubble structures proposed earlier by the scientist Kelvin.Using the Weaire–Phelan geometry, the Water Cube's exterior cladding is made of 4,000 ETFE bubbles, some as large as 9.14 metres (30.0 ft) across, with seven different sizes for the roof and 15 for the walls.
The structure had a capacity of 17,000[9] ring the games that is being reced to 7,000. It also has a total land surface of 65,000 square meters and will cover a total of 32,000 square metres (7.9 acres). Although called the Water Cube, the aquatic center is really a rectangular box (cuboid)- 178 metres (584 ft) square and 31 metres (102 ft) high.
6. 水立方英文介紹
水立方的中文翻譯:
國家水上運動中心,被稱為'水立方' ,將是一個最引人注目和令人振奮的場地特徵的體壇盛事,為2008年北京奧運會。
該中心的內部,也使得一個強烈印象:
2003年7月,該財團的工程顧問,建築設計公司ptw ,建築(中國國家建設和工程公司)和深圳市建築設計研究院(建築+設計) ,贏得了國際性的設計比賽,為國家水上運動中心,為2008年北京奧運會。
競爭,這是判斷的評審團由國際建築師,工程師及前著名華人學者,展開與意見書,由十個國際財團,也涉及公共展覽和表決。
水立方看來也會隨時准備在2007年10月。無論是混凝土和鋼結構已經完成, 500平方米的原型板被安裝在2006年4月。下一階段的工作是安裝所有的包層,然後再跟進就與德propping內部結構和完善的內部。
該建築的結構設計是基於對自然形成的肥皂泡
到達該建築的結構設計,是基於對自然形成的肥皂泡給予一個隨機的,有機的外觀,我們常用的研究方法,由weaire和phelan (教授,物理系)到如何利用肥皂泡沫可能會被安排在一個無限陣列。
把設計到生活中,個別氣泡被納入一個塑料薄膜,並適合像一個縫紉格局。整整一節是拼湊起來的,然後付諸到地方內部結構。有內部和外部的電影,和電影,然後膨脹,一旦它在原位。它會不斷抽水。
實際抽水已分段承包,一旦安裝完成後,經營者必須既負責操作和維修的幌子,為十年。這是一個關鍵組成部分,言簡意賅,在選擇承包商。
該項目是一個機會,為我們提供了我們的專業知識在永續服務。建築將採用太陽能加熱游泳池和室內面積,而所有反沖洗水是經過過濾和回到泳池。
該計劃與設計該項目是在澳大利亞。該項目現在已經移交給一個團隊,在北京的人,照顧施工。
7. 水立方的英文介紹,謝謝。
Located in the Beijing Olympic park, the national aquatics center, also known as "Water Cube", is the main swimming pool built for the 2008 summer Olympic Games and one of the landmark buildings of the 2008 Beijing Olympic Games.
Its design scheme is the "water cube" ([H2O]3) generated by the global design
competition. It and the national stadium (commonly known as the bird's nest) are on both sides of the northern end of the central axis of Beijing, forming a relatively complete image of Beijing as a famous historical and cultural city.
The construction area of the national swimming center is planned to be 62,950 square meters, with a total construction area of 65,000-80,000 square meters.
The construction area of the underground part is not less than 15,000 square meters, and the length, width and height are 177m ×177m ×30m respectively.
譯文:
國家游泳中心又稱「水立方」(Water Cube)位於北京奧林匹克公園內,是北京為年夏季奧運會修建的主游泳館,也是2008年北京奧運會標志性建築物之一。
它的設計方案,是經全球設計競賽產生的「水的立方」([H2O]3)方案。其與國家體育場(俗稱鳥巢)分列於北京城市中軸線北端的兩側,共同形成相對完整的北京歷史文化名城形象。
國家游泳中心規劃建設用地62950平方米,總建築面積65000-80000平方米,其中地下部分的建築面積不少於15000平方米,長寬高分別為 177m ×177m ×30m。
(7)水立方基本介紹英語怎麼說擴展閱讀:
鳥巢(國家體育館)
體育場由雅克·赫爾佐格、德梅隆、艾未未以及李興剛等設計,由北京城建集團負責施工。體育場的形態如同孕育生命的「巢」和搖籃,寄託著人類對未來的希望。設計者們對這個場館沒有做任何多餘的處理,把結構暴露在外,因而自然形成了建築的外觀。
2003年12月24日開工建設,2008年3月完工,總造價22.67億元 。作為國家標志性建築,2008年奧運會主體育場,國家體育場結構特點十分顯著。體育場為特級體育建築,大型體育場館。主體結構設計使用年限100年,耐火等級為一級,抗震設防烈度8度,地下工程防水等級1級。
2014年4月中國當代十大建築評審委員會從中國1000多座地標建築中,綜合年代、規模、藝術性和影響力四項指標,初評出二十個建築。
最終由此產生十大當代建築。北京鳥巢——國家體育場為初評入圍建築之一 。作為北京2022年冬奧會冰上項目場館,國家體育場改造工程將於2020年初開工。
8. 水立方英語介紹翻譯
國家水上運動中心,被稱為'水立方' ,將是一個最引人注目和令人振奮的場地特徵的體壇盛事,為2008年北京奧運會。
該中心的內部,也使得一個強烈印象:
2003年7月,該財團的工程顧問,建築設計公司ptw ,建築(中國國家建設和工程公司)和深圳市建築設計研究院(建築+設計) ,贏得了國際性的設計比賽,為國家水上運動中心,為2008年北京奧運會。
競爭,這是判斷的評審團由國際建築師,工程師及前著名華人學者,展開與意見書,由十個國際財團,也涉及公共展覽和表決。
水立方看來也會隨時准備在2007年10月。無論是混凝土和鋼結構已經完成, 500平方米的原型板被安裝在2006年4月。下一階段的工作是安裝所有的包層,然後再跟進就與德propping內部結構和完善的內部。
該建築的結構設計是基於對自然形成的肥皂泡
到達該建築的結構設計,是基於對自然形成的肥皂泡給予一個隨機的,有機的外觀,我們常用的研究方法,由weaire和phelan (教授,物理系)到如何利用肥皂泡沫可能會被安排在一個無限陣列。
把設計到生活中,個別氣泡被納入一個塑料薄膜,並適合像一個縫紉格局。整整一節是拼湊起來的,然後付諸到地方內部結構。有內部和外部的電影,和電影,然後膨脹,一旦它在原位。它會不斷抽水。
實際抽水已分段承包,一旦安裝完成後,經營者必須既負責操作和維修的幌子,為十年。這是一個關鍵組成部分,言簡意賅,在選擇承包商。
該項目是一個機會,為我們提供了我們的專業知識在永續服務。建築將採用太陽能加熱游泳池和室內面積,而所有反沖洗水是經過過濾和回到泳池。
該計劃與設計該項目是在澳大利亞。該項目現在已經移交給一個團隊,在北京的人,照顧施工。
9. 鳥巢和水立方的英文簡介
國家體育場 (鳥巢)
國家體育場由瑞士赫爾佐格和德梅隆建築事務所與中國建築設計研究院合作設計,因為裸露在外的架構形成了體育館的碗狀而被人稱為『鳥巢』。體育場坐落在奧林匹克公園里,在奧運會舉行期間能容納10萬人,奧運會的開閉幕式已經運動賽事也將在這里舉行。
建這個體育場共耗資4.23億美元,奧運會之後將改造成為多種運動的場館,最多能容納8萬人。
National Stadium
Designed by Swiss firm Herzog de Meuron in collaboration with the China Architecture Design & Research Group,the National Stadium is fondly known around town as the Bird』s Nest for its latticelike concrete skeleton forming the stadium bowl.Located in the Olympic Park,the stadium is able to seat 100,000 ring the Games,and will be the site of opening and closing Olympic ceremonies,as well as athletic events and soccer finals.Costing US$423 million,the stadium will be converted into a multi-purpose sporting facility post Games,with a maximum capacity of 80,000 people.
國家游泳中心(水立方)
國家游泳中心又被稱為『水立方』,由澳大利亞PTW公司,奧雅納公司與中建國際設計顧問有限公司,中國建築工程總公司協作設計。游泳中心耗資1億美元,其中部是半透明的立方體建築,上邊覆蓋著半透明的『氣泡』,外觀上給人一種水的感覺。『水立方』有1.7萬個席位,內設各種高科技設施,包括定位運動員的系統和多角度,三維屏幕系統,供水下賽事報道。
National Aquatic Center
Known as the Water Cube,the National Aquatic Center
Is the brainchild or Australian firms PTW Architects and Ove Arup,in collaboration with the China State Construction Engineering Corporation and the China State Construction International Design CO Ltd.Costing US$100 million, the center features a semi-transparent cube structure,covered in transparent 」bubbles」 to give a water like effect to the exterior.It can hold over 17,000 people,and is also fitted with various high-tech facilities including optical devices used to define the position of athletes,and multiple-angle,three-dimensional screening systems to provide under water event coverage.
10. 水立方英語簡介 還有漢語翻譯
National Swimming Center
Open Category: Sports, Beijing, construction, the Olympic Games venue
Contents
• [Introction]
• [National Swimming Center Construction Events:
• [uses]
• [design]
• [green] venues
• cubic meters of water [water] water-saving programme
• cubic construction techniques [water]
English title: National Aquatic Center
[Introction]
National Swimming Center is also known as the "Water Cube" (Water Cube), the Beijing Olympic Park, is the Beijing 2008 Summer Olympic Games for the construction of the main swimming pool, the 2008 Beijing Olympic Games is a landmark building one. Its design is based on the global design competition, "water cube" ([H2O] 3) programme. 24 December 2003 started in January 28, 2008 completion. With the National Stadium (commonly known as bird's nest) points out in the Beijing city on both sides of the north end of the axis, a relatively common historical and cultural integrity of the Beijing city image. National Swimming Center plans to build 62,950 square meters land, with a total construction area of 65000-80000 square metres, of which part of the ground floor area of not less than 15,000 square meters, respectively, for USD 177 m × 177m × 30m. Up to the present, from 101 countries and regions over 350,000 Hong Kong and Macao compatriots and overseas Chinese donated a total of 850 million yuan. Zhengyutong them, Mr Cheng said the father and son and their enterprises have donated 50 million yuan.
Investment: about 1.02 billion
Construction area (m 2): 79,532 square meters
Seats: permanent seats for the 4000, 2000 can be removed, temporary seats 11,000
Use ring the Olympics: swimming, diving, synchronized swimming
During the Paralympics use: swimming, diving, synchronized swimming
Owners units: Beijing state-owned asset management limited liability company
Design unit: built in the design of the Commonwealth
General Packet unit: built in the construction and development of a Limited
[National Swimming Center Construction Events:
July 2003 National Swimming Center architectural design programme officially confirmed
December 24, 2003 cubic meters of water foundation earthwork and infrastructure works started
April 7, 2004 to complete earthwork and foundation treatment works
July 17, 2004 the National Swimming Center and construction and installation works formal signing of the contract
2005 a quarter of all the main concrete structure construction
April 10, 2006 National Swimming Center to cap the main structure completed the installation of Steel
June 16, 2006 Steel support system successfully unloaded
August 1, 2006 the National Swimming Center membrane structure installed with a membrane structure-occipital
December 26, 2006 completed installation of membrane structure
March 2007 completed installation of the equipment and start on-line debugging
January 28, 2008 formally completed
[Uses]
2008 Olympic Games, the National Swimming Centre for swimming, diving, synchronized swimming competition, which could accommodate 17,000 spectators seats, including permanent seats for 6,000 spectators, additional temporary seats ring the Olympic Games, 11,000 (after will be dismantled). After will be built into the international advanced level of the set, swimming, sports, fitness, recreation in the center of one.
[Design]
National Swimming Center design is based on the global design competition, "water cube" ([H2O] 3) programme. The programme by the China State Construction Engineering Corporation, Australia PTW Architects, ARUP Australia Limited joint design. Design reflects [H2O] 3 ( "Water Cube") design, architectural design and financial structure of integrated design, the design novel, unique structure, and the National Stadium are more harmonious, functional fully meet the requirements of the 2008 Olympic Games tournament, and easy to After operators.
Beijing National Swimming Center from the state-owned assets management company responsible for the construction, management and operation, started at the end of 2003, have been completed before the end of 2007 and put into trial operation and accept International Swimming Federation and the International Olympic Committee's inspection and acceptance.
[Green] venues
Green Olympics, Hi-tech Olympics, People's Olympics, the Beijing Olympic Games as the three core concepts for the Beijing Olympic Games is a programmatic work of guiding significance. Three in the concept, the first of which is a green Olympics. "Beijing Olympic Action Plan" in the definition of a green Olympics, it is not difficult to see that the green Olympic Games each of the sessions, people need to have high standards for the protection of the ecological quality, in accordance with the work to implement the standards.
National Swimming Center main building of advanced energy-saving technologies, including the use of heat pumps, solar energy use, comprehensive utilization of water resources, advanced HVAC systems, as well as control systems and other energy saving and environmental protection technologies, such as the use of external insulation to rece energy loss applying energy efficient lighting and light control technology. These new standards, new technologies and the use of new materials for China's future energy-saving building construction has played a good role model, but also further stimulate and promote the construction of energy-saving technologies and the development of instries.
Cubic water used in ETFE membrane material, the most appropriate performance "Water Cube" Water Cube "appearance looks like a blue box of water, and no rules like a wall on the bubble. This bubble the materials used "ETFE" that is, we often say that the "poly fluoride." of such material corrosion resistance, thermal insulation of superb, self-cleaning ability. foreign anti-aging tests prove that it can be used 15 to 20 years. such material and also very strong, it is alleged that in the injury will not jump above it. absolutely at the same time as its own water-borne, it can use its own natural completion of clean water, is a new environmental protection materials. like a "water bubbles "ETFE film has better compression, the thickness of a piece of paper just as ETFE membrane composition of the gas pillow, and even can bear the weight of a car. gas pillow positioned under the different distribution of the density of the outer membrane uneven coating, which would become effective plating shielding direct sunlight into the museum, a shading and cooling effect.
[Cubic water water water-saving programme:
* Change Control swimming pools
To ensure that the "Water Cube" to the quality of the latest health standards FINA, swimming pools of water will be used sand filter - ozone - activated carbon water purification process, all use ozone disinfection. According to reports, ozone disinfection not only can effectively remove the water smell, but also eliminate the water on the human body, stimulating.
In addition, the swimming pools will be full use * Change control technology, to improve the operating efficiency of water purification systems, water purification Pharmacy and lower power consumption, save water pools fill more than 50 per cent. In addition, swimming pools and water play pool impermeable concrete will be used to prevent leakage.
Bath water for flushing and irrigation
Apart from the swimming pool water, "Water Cube" other water conservation also. Toiletries such as wastewater, and will contact the biological oxidation, filtration, activated carbon adsorption and reuse After disinfection, the venue for the toilet flushing, garage floors and washing Green Outdoor irrigation. This alone can save water annually 44,530 tons of water. In addition, in order to rece water evaporation, "Water Cube" outdoor green space will be concted at night irrigation, the use of micro-irrigation sprinkler Israel, can be built to conserve water by 5%.
Sanitary based meter of water
In order to minimize people in the use of waste water, "Water Cube" on the toilet, bathing lead, vanities and other devices are used inctive flushing valve, the reasonable control of sanitary ware from water, and water points in the set focus water, and measure water consumption. Through these measures is expected to be about 10% water.
Apart from the bath water, "water cube" game hall will be set up in the drinking water, for the athletes and spectators to provide drinking water. To avoid the secondary pollution of drinking water, avoid wastage, "Water Cube" will be used for drinking water straight terminal-processing equipment.
Cubic construction techniques [water]
Membrane Structure is the most representative of the 21st century a new architectural forms, has become a large-span space one of the main forms of construction. It set architecture, structural mechanics, chemical instry, materials science and computer technology, integrated with the construction of a symbolic structure of the space, it not only reflects the strength of the United States, also fully demonstrate the idea of Architects, to enjoy nature romantic space. In the 2008 Olympic Games in architectural design, the application of membrane structures on the perfect embodiment.
"Water Cube" is the world's largest membrane structure engineering, architectural external use the world's most advanced environmental protection, energy conservation ETFE (ethylene tetrafluoroethylene) membrane material. National Stadium project contracting, general manager of Tanxiaochun revealed that the life expectancy of such material for more than 20 years, but the actual length than this, people can walk on the hit, feeling special rods. Currently the world, only three are able to complete this membrane structure.
"Water Cube" from the construction of more than 3,000 pillow gas, gas pillow sizes, shapes vary, covering 100,000 square meters, called world's greatest. Apart from the ground, the appearance of the membrane structure used. Pillow successful installation of the gas will be pre-installed on the steel frame in the pipeline inflatable become inflated "bubble," the entire process from computer inflatable intelligent monitoring, and the light of the prevailing atmospheric pressure, light conditions, such as the "bubble" to maintain the best state.
Such as "bubble filled" with the same membrane material self-cleaning function, the surface of the membrane is basically did not have any st. Even if e to st, natural precipitation is sufficient to enable a clean and as new. In addition, the membrane material has better compression of the people above playing the "trampoline" no problem "normal place of a car will not be crushing." If the event of the outer membrane rupture, according to the contingency plan, in eight hours of the damaged membrane repair or replacement. "Cubic water" crystal clear above the cloak also dotted with countless white bright spot, known as plating, they can change the direction of the light, the effect of a thermal insulation astigmatism.
In addition, the "Water Cube" an area of 7.8 hectares, but did not use a steel, concrete one. Its walls and ceiling are connected by pipe from the small, 12,000 nodes. Only 2.4 mm thick pillow-like membrane structures like包住skin of the entire building, one of the largest gas pillow about 9 square meters, a minimum of less than 1 square meter. Compared with glass, it can be more thoroughly into the sunlight and air, thereby allowing the pool to maintain constant temperature, can be energy-saving 30%.
What is the cube of water
The perfect embodiment membrane structure - Water Cube
Membrane Structure is the most representative of the 21st century a new architectural forms, has become a large-span space one of the main forms of construction. It set architecture, structural mechanics, chemical instry, materials science and computer technology, integrated with the construction of a symbolic structure of the space, it not only reflects the strength of the United States, also fully demonstrate the idea of Architects, to enjoy nature romantic space. In the 2008 Olympic Games in architectural design, the application of membrane structures on the perfect embodiment.
"Water Cube" is the world's largest membrane structure works, in addition to the ground, the appearance of the use of membrane structure - ETFE, blue surprisingly soft on the surface but very substantial. National Stadium project contracting, general manager of Tanxiaochun revealed that the life expectancy of such material for more than 20 years, but the actual length than this, people can walk on the hit, feeling special rods. Currently the world, only three are able to complete this membrane structure.
"Taking into account the energy-saving standard venues, membrane structure has strong thermal efficiency; In addition, the repair of this structure is very convenient, for example, shooting guns or sharp poke into things, monitoring computer will automatically be felt. Break if a hole, the only one with stickers on the trip; membrane structure is also very compact, and has a good self-cleaning, st is not easy glued to the top, st with water can be discharged. "Tanxiaochun said, membrane structure that they themselves have drainage and sewerage, as well as the functions of Moisture Removing and antimist function, in particular the anti-condensation function of swimming is particularly important.
Moxie water as a construction, water cube form the structure of the complex and freedom, from the planning system ingenious and simple variation, simple pure shape modest home with the magnificent dialogue, different temperament contrast to their spirituality to be fun symbiotic. Palm beach, artificial waves…… sublimation of the Olympic Stadium for the people of the world never mind the water park.
中文見網路