當前位置:首頁 » 英文介紹 » 介紹體育場英語怎麼說

介紹體育場英語怎麼說

發布時間: 2021-02-22 02:55:27

1. 體育場英語怎麼寫

stadium
gym

2. 北京奧林匹克體育館的英文介紹

Olympic Sports Centre Stadium (simplified Chinese: 奧體中心體育場; traditional Chinese: 奧體中心體育場; ) is a multi-purpose stadium in Beijing, China. It is currently used mostly for football matches. It was constructed in 1990 for the Asian Gamesheld that year. It was renovated to host the 2008 Summer Olympics, where it hosted football matches and the running and riding parts of the modern pentathlon events. For the riding discipline, the football field at the core of the venue has been turned into a high-standard temporary equestrian field. The renovation also added four pavilion-styled rotating rampways around the stadium.
The stadium has a floor space of 34,975 square metres, which exceeds the original building area of 20,000 square metres. Its capacity has doubled after the renovation, from about 18,000 to 36,228.

3. 體育場的英語

stadium

4. 體育場英語單詞怎麼寫

體育場 [tǐ yù chǎng] 英語:stadium

5. 體育場 用英語怎麼說

體育場: [ tǐ yù chǎng ]

1. stadium

6. 「體育館」用英語怎麼說

gymnasium [dʒim'neiziəm] n. 體育館;健身房gym[dʒim] [口語]體育館;健身房stadium ['steidiəm] n. 體育場;露天大型專運動場

7. 用英語簡介三個奧運體育場。

水立方

The National Aquatics Centre, known as 'The Water Cube', will be one of the most dramatic and exciting venues to feature sporting events for the Beijing Olympics in 2008.

The interior of the Centre also makes a strong impression
In July 2003, the consortium of Arup, architecture firm PTW, the CSCEC (China State Construction and Engineering Corporation) and the CSCEC Shenzhen Design Institute (CSCEC+DESIGN) won the international design competition for the National Aquatics Centre for the 2008 Beijing Olympics.
The competition, which was judged by a panel of international architects, engineers and pre-eminent Chinese academics, commenced with submissions from ten international consortia and also involved a public exhibition and vote.
The Water Cube looks set to be ready in October 2007. Both the concrete and the steel structure have been completed, and 500 m² of prototype cladding was installed in April, 2006. The next phase is to install all of the cladding and then follow on with de-propping the internal structure and completing the interior.

The building's structural design is based on the natural formation of soap bubbles
To arrive at the building's structural design, which is based on the natural formation of soap bubbles to give a random, organic appearance, we used research undertaken by Weaire and Phelan (professors of physics) into how soap bubbles might be arranged in an infinite array.
To bring the design to life, the indivial bubbles are incorporated into a plastic film and tailored like a sewing pattern. An entire section is pieced together and then put into place within the structure. There are interior and exterior films, and the film is then inflated once it is in-situ. It will be continuously pumped thereafter.
The actual pumping has been sub-contracted, and once the installation is complete the operator will be responsible for both the operation and maintenance of the facade for ten years. This was a key component of the brief and in the choice of contractor.
The project is an opportunity for us to offer our expertise in sustainable services. The building will use solar energy to heat the pools and the interior area, and all backwash water is to be filtered and returned to the swimming pools.
The scheme and design for the project was developed in Australia. The project has now been handed over to a team in Beijing who are taking care of the construction.

鳥巢

Beijing National Stadium (Bird's Nest/Olympic Stadium)

The Beijing National Stadium, also known as the bird's nest will be the main track and field stadium for the 2008 Summer Olympics and will be host to the Opening and Closing ceremonies. In 2002 Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. The stadium will seat as many as 100,000 spectators ring the Olympics, but this will be reced to 80,000 after the games. It has replaced the original intended venue of the Guangdong Olympic Stadium. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The 250,000 square metre (gross floor area) stadium is to be built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium will cost up to 3.5 billion yuan (422,873,850 USD/ 325,395,593 EUR). The ground was broken in December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004.

In the new design, the roof of the stadium had been omitted from the design. Experts say that this will make the stadium safer, whilst recing construction costs. The construction of the Olympic buildings will continue once again in the beginning of 2005.

In depth
The stadium's appearance is one of synergy, with no distinction made between the facade and the superstructure. The structural elements mutually support each other and converge into a grid-like formation - almost like a bird's nest with its interwoven twigs. The spatial effect of the stadium is novel and radical, yet simple and of an almost archaic immediacy, thus creating a unique historical landmark for the Olympics of 2008.

The stadium was conceived as a large collective vessel, which makes a distinctive and unmistakable impression both from a distance and when seen from up close. It meets all the functional and technical requirements of an Olympic National Stadium, but without communicating the insistent sameness of technocratic architecture dominated by large spans and digital screens.

Visitors walk through this formation and enter the spacious ambulatory that runs full circle around the stands. From there, one can survey the circulation of the entire area including the stairs that access the three tiers of the stands. Functioning like an arcade or a concourse, the lobby is a covered urban space with restaurants and stores that invite visitors to stroll around. Just as birds stuff the spaces between the woven twigs of their nests with a soft filler, the spaces in the structure of the stadium will be filled with inflated ETFE cushions. Originally, on the roof, the cushions were to be mounted on the outside of the structure to make the roof completely weatherproof, but the roof has been omitted from the design in 2004.

While the rain was to be collected for rainwater recuperation, the sunlight was to filter through the translucent roof, providing the lawn with essential ultraviolet radiation. On the facade, the inflated cushions will be mounted on the inside of the structure where necessary, e.g. to provide wind protection. Since all of the facilities -- restaurants, suites, shops and restrooms -- are all self-contained units, it is possible to do largely without a solid, enclosed facade. This allows for natural ventilation of the stadium, which is the most important aspect of the stadium's sustainable design.

The sliding roof was an integral part of the stadium structure. When it was to be closed, it would have converted the stadium into a covered arena; however, the sliding roof was eliminated in an effort to cut costs and increase overall safety of the radical new structure.

國家體育場 = 鳥巢

National Palaestra (Bird's Nest)

8. 用英語介紹國家體育場.怎麼寫,

鳥巢
Beijing National Stadium, known as the National Stadium,or colloquially as the "Bird's Nest", is a stadium in Beijing, China. The stadium was designed for use throughout the 2008 Summer Olympics and Paralympics.

Located in the Olympic Green, the US$423 million stadium is the world's largest steel structure. The design was awarded to a submission from the Swiss architecture firm Herzog & de Meuron in April 2003, after a bidding process that included 13 final submissions. The design, which originated from the study of Chinese ceramics, implemented steel beams in order to hide supports for the retractable roof; giving the stadium the appearance of a "Bird's nest". Ironically, the retractable roof was later removed from the design after inspiring the stadium's most recognizable aspect. Ground was broken in December 2003 and the stadium officially opened in June 2008. A shopping mall and a hotel are planned to be constructed to increase use of the stadium, which will host football events after the Olympics.

9. 「體育場」英語怎麼說

palaestra
[pE`lestrE,-`li:-]
n.
(古希臘來或羅馬的自)角力學校, 體育場, 體育館, 健身房
stadium
[5steidiEm]
n.
露天大型運動場
gym
[dVim]
gymnasium 體育
n.
體育館, 體操

10. 體育館用英文怎麼說

gymnasium [dʒim'neiziəm] n. 體育館;健身房

gym[dʒim] [口語]體育館;健身房

stadium ['steidiəm] n. 體育場;版露天大型運動場權

熱點內容
考試的等級用英語怎麼翻譯 發布:2025-09-07 12:19:27 瀏覽:824
天黑前怎麼翻譯成英語怎麼說 發布:2025-09-07 12:18:42 瀏覽:268
我回來給你的英語怎麼翻譯 發布:2025-09-07 12:18:04 瀏覽:299
是否用英語怎麼翻譯 發布:2025-09-07 12:03:21 瀏覽:555
被某人介紹給某人的英語怎麼翻譯 發布:2025-09-07 11:57:49 瀏覽:402
我喜歡在英語怎麼翻譯 發布:2025-09-07 11:55:30 瀏覽:530
主空氣管道英語怎麼說及英文翻譯 發布:2025-09-07 11:55:22 瀏覽:824
他知道的英語怎麼翻譯成英文 發布:2025-09-07 11:53:04 瀏覽:357
你想叫別人去看錶演英語怎麼翻譯 發布:2025-09-07 11:40:01 瀏覽:163
役租英語怎麼說及英文翻譯 發布:2025-09-07 11:39:55 瀏覽:128