道路规划英语怎么说及英语单词
❶ 道路用英语怎么说
答案是: 道路,路,
road,way
或者是
path ,highway
☞
♧手工翻译☀尊重劳动☀欢迎提问回☀感谢采纳答♧
☜
❷ 道路的英语翻译 道路用英语怎么说
way
n. 方法;道路;方向;行业;习惯
adj. 途中的
adv. 大大地;远远地
road
n. 公路,马路;道路;手专段
adj. (美)巡回的属
vt. (狗)沿臭迹追逐(猎物)
path
n. 道路;小路;轨道
roadway
n. 道路;路面;车行道;铁路的路基
❸ 城市和马路的英语单词
城市:city
公路:road
另外城市的反义词是:village
路的英语是way,它也可做方式的意思。
望采纳!!!!!!!!!!
❹ 规划英语怎么说
规划 [guī huà]
[释义] planning; programming; layout; project; schematization;
[例句]
1、必须协调城市规划和土地分配之间的关系。
Town planning and land allocation had to be coordinated.
2、这份规划文件内可以追溯到2009年,文件中表示,容到2015年,流媒体服务将成为Xbox的主要特色。
The planning document which dated back to 2009 said streaming could be a major feature of Xbox by 2015.
3、该项规划中所有的房屋样儿都差不多。
All the houses in this project are alike.
❺ 规划的英语单词
1.programming
2.planning
3.program
4.plan
如:
城市规划
urban planning
线性规回划
linear programming
非线答性规划
nonlinear programming
战略规划
1.strategic planning
2.strategic plan
❻ 公路的英语单词是什么
公路的英语单词是road。
road[英][rəʊd][美][roʊd]
n.公路;
通路;
途径;
方法;
vt.在…设置路障;
(狗)内沿臭迹追容逐(猎物);
(狗)闻着臭迹追;
That's
a
long
road.
那是条长长的公路。
❼ 道路建设用英语怎么说
道路建设
[词典] road construction;
[例句]而在城市道路建设中,景观设计是不可或版缺的一个重要权部分。
In the urban road construction, sight design is an indispensable part.
❽ 城市规划用英语怎么说~
城市规划 Urban Planning
土木工程Civil Engineering
❾ 道路建设英语
中导及中墙:a midest adit and a midest wall
明洞中墙浇好后:After, the midest wall in an open cut tunnel has been ready with placing
衬砌:line.动词 lining名词
Ⅴ级围岩(surrounding rock)地段拟采用三导坑法施工,Ⅳ围岩地段采用中导坑法施工,主洞采用留核心土法开挖。洞身开挖先开挖中导洞(guide adit),施做中墙,后开挖右行线的右导洞、右侧正洞,然后开挖左行线左导洞、左侧正洞。开挖时,右幅隧道应超前于左幅隧道,超前长度不大于30m,二次衬砌浇筑(placing)的交错长度不得大于一个衬砌循环的长度。不得出现左右幅隧道均只有初期支护的工况。隧道开挖(excavate)作业按设计进行超前支护,然后采用机械或钻爆开挖,开挖完成后及时进行支护施工。
隧道开挖一定距离且与开挖作业面互不影响情况下,先仰拱施工后进行二次衬砌,再施工路面、排水沟及电缆槽,最后进行洞内装修、机电安装。
V-grade surrounding rock sector is planed to to be constructed in a three-guide-adit mathod, IV-grade surrounding rock in a midest-pilot approach and the main cave in another method to be caverned in which the core earth is left untouched. When the body of the cave, the midest wall is excavated first, then the right guide adit for the right running and the frontal cave at the right side, finally the the left guide adit for the left running and the frontal cave at the left side. When excavated, the right limit tunnel should move ahead of the left tunnel at a streach not longer than 30m, the interleaving length of the double-times placing of lining must not be longer than that of the lining circle and both right and left tunnels must not only have the operating condition of the supporting at the initial stage. Excavating operation for the tunnel should follow the design to be supported ahead of schele, and then to be excavated by means of machine or drilling and exploding. After excavating has been done, supporting operation should be go on in time. In the case of the excavating of the tunnel has streached for a certain distantce and the surfaces of the work do not influenced each other, the road surface, the draining channel and the troughs for electric cables can be operated, following arch inverting the operated double-clining firstly. Finally, the finishing in the cave and electromechanical install can be carried on.
❿ 用英语怎么说道路用"road"准确的
希望能够帮到你,祝学习进步。